AUSTRALIA · NEW ZEALAND · PACIFIC ISLANDSSales +61 477 304 101
Our team & support

People behind your
energy project.

Meet the business contact behind Freedom Won Australia and understand how product supply, integration, installation and ongoing support fit together.

Publisher Freedom Won AustraliaPublished Updated

Key takeaways

  • Hennie is the owner and business contact for Freedom Won Australia.
  • FWA supplies batteries and delivers commercial and industrial integration within the agreed project scope.
  • The proposal should identify who is responsible for design, installation, commissioning and support.
  • For existing systems, provide the installer, battery model, serial number and a clear description of the issue.

Hennie · Owner, Freedom Won Australia

Hennie provides the business contact behind FWA’s regional supply and project operation. The team connects customers with product information and with the resellers, distributors and solution providers appropriate to their location and application.

Freedom Won Australia has served the region since 2019. Battery manufacture takes place in South Africa; regional supply, project coordination and support are handled through FWA and the relevant project partners. Read our company story or find a regional contact.

Who does what on your project?

RoleWhat to establish
FWA product and supply teamBattery selection, applicable technical documents, supply enquiry and the proposed integration scope.
System designer and project leadLoad assessment, equipment schedule, conversion architecture, site interfaces and responsibility for the complete system.
Installer and commissioning teamRequired qualifications, installation scope, checks, acceptance records and operating handover for the location.
System owner and operatorOperating priorities, site information, monitoring access, maintenance arrangements and the contact for support.

The responsible parties and their scope should be named in the proposal. A reseller listing or technology logo does not replace the qualifications and approvals required for the actual work.

A clear scope from proposal to handover

For commercial and industrial projects, FWA brings battery storage, power conversion and controls together and takes on integration risk within the agreed project scope. Ask us to make that scope explicit in your proposal:

  • Equipment and interfaces: the battery, inverter, controls, existing equipment and work included.
  • Operating requirements: the loads, modes, reserves and documented assumptions used for the design.
  • Acceptance and handover: the agreed commissioning evidence, outstanding items, operating documents and monitoring access.
  • Support and warranty: who receives a fault report, who coordinates an integration issue, and which product and installation terms apply.

Contractual responsibilities, remedies and response arrangements are those set out in the agreed proposal and applicable terms. Review the model warranty documents and FWA standard terms with the supplied equipment schedule.

Get the right help

For a new project, email sales@freedomwonaustralia.com or call +61 477 304 101. Include your location, intended application, load data and existing equipment details. Office hours are Monday–Friday, 8:30am–4:00pm, Brisbane time.

For an existing installation, begin with the responsible installer. Keep the model, serial number, commissioning records and fault description together so the issue can be directed to the right party. Distributors can also use the technical support portal.

How to read our technical and project information

Freedom Won Australia publishes the website’s product guides and project descriptions. Product specifications link to the relevant manufacturer sheet or supplied brochure. Case studies distinguish installed equipment from planned expansion, and illustrative calculations from measured results.

If you identify a discrepancy, send the page address and exact model details to FWA. The current project documentation and approved equipment schedule should resolve model-specific questions before ordering or installation. Dates on articles show original publication and subsequent content updates.

Frequently asked questions

Who owns Freedom Won Australia?

Hennie owns Freedom Won Australia and is the business contact behind its regional product and supply operation.

Who is responsible for installation and commissioning?

The responsible qualified project team is identified for the agreed scope. Ask the proposal to name the design, installation, commissioning and support responsibilities.

How do I request support for an installed battery?

Start with the responsible installer and provide the battery model, serial number, commissioning records and fault information. Contact FWA when product-specific or integration assistance is needed.

Bring your project to the right team.

Discuss your project ↗
Company details

The company behind Freedom Won Australia

Freedom Won Australia is a registered business name of Stalwart Energy Australia Pty Ltd, an Australian private company. Our Australian Business Number is ABN 17 132 808 694.

Check the entity and business-name registration on the Australian Government’s ABN Lookup.

Call our teamDiscuss your project ↗